Use casesFollow-ups
Catch the design handoffs that fell through the gap
Mitra checks both sides of the design handoff every Monday morning and posts what does not line up to Slack. The agent looks for designs marked ready for build with no Linear issue behind them, and shipped issues whose designs are still in progress. Two lists, one short post.
Each Monday at 10am, cross-check the Figma files marked ready for build against Linear, then tell #design which of those designs have no issue yet and which shipped issues still have designs sitting in progress.
200 credits to start · no credit card
What the agent actually does.
Read what design calls ready
The agent goes through your Figma files and collects everything marked ready for build, with the date each one was marked.
Read what engineering has
Linear issues are matched against those designs by name and by link, so the agent knows which designs already have a ticket behind them.
Name the two gaps
Designs handed over with nobody building them go in one list. Issues already shipped whose designs are still in progress go in the other.
Post both lists to #design
The post lands before Monday planning, short enough to read in the meeting and specific enough to act on in it.
Make it yours.
For the designer and the engineering lead who each assume the other side picked the handoff up, and find out weeks later that neither did. Change any of this by saying so — there is nothing to rewire.
- Add a third list for designs that changed after the issue was already built.
- Send each list to a different channel, one for design and one for engineering.
- Stay quiet on Mondays when both sides line up, rather than posting an empty check.
Questions, answered.
How do I tell which designs have not been picked up by engineering?
Can an agent tell when a shipped feature is running on an old design?
Hand over the work you keep repeating.
Your first agent is one sentence away.
Get started free200 credits to start · no credit card · nothing to install